Lock, Stock and 2 Smoking Barrels.
Friday, 7 May 2010
Rebuild.
The rebuild of my Sporty is happening, and i've not shown any pics on here, been through the dry build stage, the frame is back from the paint shop, and the engine is nearly finshed...not sure on those pipes though...
Cooooool......Flaps
Now running with whitewall flaps, not got round to fitting the 7" banded steels to the front end, think i prefer the skinny's.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)